Final Report by Independent Engineers for Legacy Connector Study
Farmington City hired the independent engineer Tim Taylor of WCEC Engineers, Inc. to give an assessment of UDOT's proposal for the North Legacy to Legacy Connector. Tonight (9/18/07) he will be presenting his findings in a joint City Council and Planning Commission meeting. This meeting is a public meeting (not a public hearing) so all should come who are interested.
To see his report as delivered to Farmington City please follow this link (this is a very large file and may take sometime to download). You must be logged into farmingtoncitizens.org to download the file: Final Report 9-17-07.pdf
See the Mayor's time line for the decision on UDOT's proposal for the connector: Mayor's Proposed Timeline for Connector Decision